Your request completed successfully.
Back to search results
*112(T)/2019

Finland. Archipelago Sea. Naantali. Naantalinsalmi. Raumakari. Vertical Clearances

Published 20.05.2019
Not valid
Charts
Last correction
26 (INT 1189)
TM 96/2019
190 (INT 1158)
TM 85(T)/2019
D706 D706.1
TM 109/2019
Validity:
Until 1 September 2019
1
Amend
190 26 D706 D706.1
Bridge vertical clearance temporarily changed.
(1) 60°27.774 'N 22°01.267'E
2
Amend
190 26 D706 D706.1
Bridge vertical clearance temporarily changed.
(1) 60°27.585 'N 22°01.112'E
3
190 26 D706 D706.1
Work will be carried out underneath the decks of the Naantalinsalmi bridges using a suspended cradle hung from the railing. Vertical clearance in the fairways will be reduced from 20 May 2019 to 9 June 2019 and from 29 July 2019 to 1 September 2019. During the work, vertical clearance will be announced with signs. The suspended cradle will be marked with a reflecting edge board and flashing lights. During the work, traffic under the bridge will be monitored. If necessary, work will be suspended and the cradle moved. After work shifts, the cradle will be moved away from the fairway.
Contact details:
Janne Brask
Site manager
+358 40 54 62465
Oteran Oy
Vistantie 19, FI-21530 Paimio, Finland
janne.brask@oteran.fi
(FTA, Helsinki/Helsingfors 2019)