3
190 26 D706 D706.1
Work will be carried out underneath the decks of the Naantalinsalmi bridges using a suspended cradle hung from the railing. Vertical clearance in the fairways will be reduced from 20 May 2019 to 9 June 2019 and from 29 July 2019 to 1 September 2019. During the work, vertical clearance will be announced with signs. The suspended cradle will be marked with a reflecting edge board and flashing lights. During the work, traffic under the bridge will be monitored. If necessary, work will be suspended and the cradle moved. After work shifts, the cradle will be moved away from the fairway.
Contact details:
Janne Brask
Site manager
+358 40 54 62465
Oteran Oy
Vistantie 19, FI-21530 Paimio, Finland
janne.brask@oteran.fi