1
The bascule bridge of/over Lillholmen and the channel under the bridge will be closed at the end of week 21.
The bascule bridge is closed until the new bridge is completed in summer 2022.
The temporary bridge is in use during the works, vertical clearance 6 m.
2
Add
105.C 26 B650 B650.1 D704 D704.1 D707
(1) 60°16.55 'N 22°17.23'E